Boeing to build 56 additional A-10 wings for US Air Force

Boeing Press Release | September 4, 2013

Estimated reading time 1 minute, 8 seconds.

Boeing will continue improving U.S. Air Force A-10 Thunderbolt II mission readiness, and decreasing maintenance costs, through a follow-on order for 56 replacement wings for that aircraft.  
 
Boeing is on contract to build up to 242 wings, including these, at its plant in Macon, Ga. Refitting the fleet with new wings will improve the mission availability of A-10s by an estimated 4 percent and will help save the Air Force an estimated $1.3 billion in maintenance costs during the next 30 years.    
This latest order is valued at $212 million. Including this agreement, the Air Force has ordered 173 wings. The efforts of Boeing, its suppliers, and the Air Force will allow the A-10 fleet to operate into 2035.
The A-10 is a twin-engine jet designed for close air support of ground forces. It can be used against all ground targets, including tanks and other armored vehicles.

Notice a spelling mistake or typo?

Click on the button below to send an email to our team and we will get to it as soon as possible.

Report an error or typo

Have a story idea you would like to suggest?

Click on the button below to send an email to our team and we will get to it as soon as possible.

Suggest a story

Leave a comment

Your email address will not be published. Required fields are marked *